Call-off Terms and Conditions for the Supply of Goods and the Provision of Services– Public Sector

HealthTrust Europe Recitals

Background to Framework Agreement

  1. HealthTrust Europe provides Procurement Services to the Beneficiaries on a call -off basis.
  2. HealthTrust Europe procured the Framework Agreement for the benefit of the Beneficiaries, and the Beneficiary wishes to enter into a call-off Contract pursuant to such Framework Agreement.

Definitions

The following defined terms are used within this call-off Contract, such terms differing from those used within the Framework Agreement:

  1. HealthTrust Europe shall be referred to as “HealthTrust Europe”; and
  2. The Beneficiary shall be referred to as the “Authority”.

Terms and Conditions

  1. The scope of these Call-off Terms and Conditions shall include both the supply of Goods and the provision of Services by the Supplier. Consequently, the Call -off Terms and Conditions shall be interpreted as follows:

    1. Goods” shall mean the “Goods and Services”;
    2. Product Information” shall mean the “Product Information and/or Services Information”; and
  2. Clause 14.1 of Schedule 2 shall be amended to read “employer’s liability, public liability, professional indemnity and product liability”.

NOW IT IS AGREED as follows:

Where an Order Form is issued by the Authority that refers to the Framework Agreement, the Contract is made between the Authority and the Supplier on the date of that Order Form. The Contract is subject to the terms set out in the schedules of these Call-off Terms and Conditions listed below (“Schedules”).

The Authority and the Supplier undertake to comply with the provisions of the Schedules in the performance of the Contract.

The Supplier shall supply to the Authority, and the Authority shall receive and pay for, the Goods and Services on the terms of the Contract.

For the avoidance of doubt, any actions or work undertaken by the Supplier prior to the receipt of an Order Form covering the relevant Goods and Services shall be undertaken at the Supplier’s risk and expense and the Supplier shall only be entitled to invoice for Goods or Services covered by a valid Order Form.

The Definitions in Schedule 4 of these Call-off Terms and Conditions apply to the use of all capitalised terms in the Contract.

SCHEDULE DESCRIPTION
Schedule 1 of these Call-off Terms and Conditions Key Provisions
Schedule 2 of these Call-off Terms and Conditions General Terms and Conditions
Schedule 3 of these Call-off Terms and Conditions Information and Data Provisions
Schedule 4 of these Call-Off Terms and Conditions Definitions and Interpretations
Schedule 5 of these Call- off Terms and Conditions Installation and Commissioning Services
Schedule 5A of these Call- off Terms and Conditions Maintenance Services
Schedule 6 of these Call- off Terms and Conditions Not Used
Schedule 7 of these Call- off Terms and Conditions Pharmaceuticals

Schedule 1 of these Call-off Terms and Conditions Key Provisions

Standard Key Provisions

1.  Application of the Key Provisions

1.1  The standard Key Provisions at Clauses 1 to 7 of this Schedule 1 of these Call-off Terms and Conditions shall apply to this Contract.

1.2  Extra Key Provisions shall only apply to this Contract where such provisions are set out.

2.  Term

2.1  This Contract shall commence on the Commencement Date.

2.2  The Term of this Contract shall be as set out in the Order Form.

2.3  The Term may be extended in accordance with Clause 15.2 of Schedule 2 of these Call-off Terms and Conditions provided that the duration of this Contract shall be no longer than any maximum applicable to the Contract if such maximum duration is set out in the Framework Agreement (including any options to extend).

3.   Contract Manager

3.1  The Contract Managers at the commencement of this Contract shall be as set out in the Order Form or as otherwise agreed between the Parties in writing.

4.  Names and addresses for notice

4.1  Unless otherwise agreed by the Parties in writing, notices served under this Contract are to be delivered to such persons at such addresses as referred to in the Order Form.

5.  Management levels for escalation and dispute resolution

5.1  Unless otherwise agreed by the Parties in writing, the management levels at which a Dispute will be dealt with are as follows:

LEVEL AUTHORITY REPRESENTATIVE SUPPLIER REPRESENTATIVE
1 Contract Manager Contract Manager
2 Assistant Director or equivalent Assistant Director or equivalent
3 Director or equivalent Director or equivalent

6.  Order of precedence

6.1  Subject always to Clause 1.10 of Schedule 4 of these Call-off Terms and Conditions, should there be a conflict between any other parts of this Contract the order of priority for construction purposes shall be:

6.1.1  the Order Form (including the incorporated Mini-Competition Specification and Mini-Competition Response Document where applicable and appended to such Order Form);

6.1.2  the applicable provisions of the Framework Agreement other than the Specification and Tender Response Document;

6.1.3  the provisions on the front page of these Terms and Conditions for the Supply of Goods and the Provision of Services (Purchase Order Version);

6.1.4  Schedule 1 of these Call-off Terms and Conditions: Key Provisions;

6.1.5  the Specification and Tender Response Document (but only in respect of the requirements);

6.1.6  Schedule 2 of these Call-off Terms and Conditions: General Terms and Conditions;

6.1.7  Schedule 3 of these Call-off Terms and Conditions: Information Governance Provisions;

6.1.8  Schedule 5 of these Call-off Terms and Conditions: Installation and Commissioning Services;

6.1.9  Schedule 5A of these Call-off Terms and Conditions: Maintenance Services

6.1.10  Schedule 7 of these Call-off Terms and Conditions: Pharmaceutical Products

6.1.11  Schedule 4 of these Call-off Terms and Conditions: Definitions and Interpretations.;

6.1.12  the order in which all subsequent schedules, if any, appear; and

6.1.13  any other documentation forming part of the Contract in the date order in which such documentation was created with the more recent documentation taking precedence over older documentation to the extent only of any conflict.

 7.  Participating Authorities’ Obligations    [  ] (only applicable to the Contract if this box is checked)

7.1  Compliance Level

7.1.1  Subject to any exceptions expressly stated in this Call-Off Contract, for each twelve-month period commencing on the Commencement Date, the Authority shall meet or exceed the Compliance Level. For the purposes of this clause Compliance Level shall mean “in respect of all Goods and Services in each Lot purchased by the Authority, at least eighty percent (80%) of such purchases (as measured by volume) shall be made pursuant to this Call-Off Contract”.

7.1.2  Failure to meet the Compliance Level by 10% or less shall not constitute a breach of this Call-Off Contract. If the Authority fails to meet the compliance level by more than 10% the Authority and Supplier shall follow the Dispute Resolution Procedure set out in Clause 22 of Schedule 2 of these Call-off Terms and Conditions.

7.2   Data

7.2.1  The Authority shall supply a full set of its accounts payable and purchase order data within 7 days of the end of each quarter during the Term so as to enable HealthTrust Europe to calculate the Compliance Level at the end of each year. HealthTrust Europe shall use the said data to provide each Participating Authority with intelligence regarding its progress towards meeting the Compliance Level for each year.

8.  Application of TUPE at the commencement of the provision of Service

8.1  The Parties agree that at the commencement of the provision of Services by the Supplier, TUPE and the Cabinet Office Statement shall not apply so as to transfer the employment of any employees of the Authority or a Third Party to the Supplier.

8.2  If any person who is an employee of the Authority or a Third Party claims or it is determined that their contract of employment has been transferred from the Authority or Third Party to the Supplier or a Sub-contractor pursuant to TUPE, or claims that their employment would have so transferred had they not resigned, then:

8.2.1  the Supplier will, within seven (7) days of becoming aware of that fact, give notice in writing to the Authority;

8.2.2   the Authority or Third Party may offer employment to such person within twenty-eight (28) days of the notification by the Supplier;

8.2.3  if such offer of employment is accepted, the Supplier or a Sub-contractor shall immediately release the person from their employment;

8.2.4  if after that period specified in Clause 8.2.2 of this Schedule 1 of these Call- off Terms and Conditions has elapsed, no offer of employment has been made by the Authority or Third Party, or such offer has been made by the Authority or Third Party but not accepted within a reasonable time, the Supplier or Sub-contractor shall employ that person in accordance with its obligations and duties under TUPE and shall be responsible for all liabilities arising in respect of any such person and shall (where relevant) be bound to apply Fair Deal for Staff Pensions in respect of any such person in accordance with the requirements of Part D of Schedule 7 of the NHS Terms and Conditions for the Provision of Services (Contract Version) (January 2018).

9.  Performance of the Services and Supply of Goods

9.1  The Supplier shall provide at its own expense all staff, equipment, tools, appliances, materials or items required for the provision of the Services and Supply of Goods to the Contract Standard.

9.2  To the extent that the Specification and Tender Response Document include the Turnaround Times, format and method of delivery of the Services and Deliverables and/or the applicable performance measures, performance due-by dates, minimum performance levels and methods of performance measurement in respect of the Services and Goods , the Supplier will abide by the same.

9.3  Time shall be of the essence with regard to the obligations of the Supplier under the Contract.

9.4  The Authority and the Supplier will co-operate with each other in good faith and will take all reasonable action as is necessary for the efficient transmission of information and instructions and to enable the Authority to derive the full benefit of the Contract. At all times in the performance of the Services, the Supplier will co -operate fully with any other Suppliers appointed by the Authority in connection with other services and Goods.

9.5  In addition to any more specific obligations imposed by the terms of the Contract, it shall be the duty of the Supplier to notify the Authority’s Contract Manager of all significant changes to staffing, rates of pay or conditions of employment, or hours of work or other technological changes at least one month prior to the implementation of any such revised arrangements, to the extent that such changes relate to the Services.

9.6  The Supplier shall provide information in a format, medium and at times specified by the Authority, related to the performance of the Services and Supply of Goods as may be reasonably required.

9.7   In providing the Services and supplying the Goods, the Supplier shall use Good Industry Practice to ensure that any computer systems and/or related hardware and/or software it uses are free from corrupt data, viruses, worms and any other computer programs which might cause harm or disruption to the Authority’s hospital information systems.

9.8  If at any time the Supplier becomes aware of any act or omission or any proposed act or omission by the Authority or by any member, official or employee of the Authority which prevents or hinders or may prevent or hinder the Supplier from providing the Services and/or supplying the Goods in accordance with the Contract then the Supplier shall immediately inform the Authority’s Contract Manager of that fact. For the avoidance of doubt, the Supplier’s compliance with this Clause shall not in any way relieve the Supplier of any of its obligations under the Contract.

9.9  The Supplier will immediately notify the Authority’s Contract Manager of any actual or potential problems relating to the Supplier’s own suppliers or subcontractors (including approved subcontractors) that affects or might affect his ability to provide the Services and/or supply the Goods.

9.10  The Supplier will be responsible for providing and maintaining the Services to the Contract Standard and KPIs at all times and will ensure continuity of supply of the Services and Goods (at no extra cost to the Authority) in accordance with the Specification and KPIs. The Supplier must have in place contingency plans and arrangements which are approved by the Authority to ensure continuity of supply of the Services and Goods.

9.11  The Supplier will immediately notify the Authority’s Contract Manager of any actual or potential industrial action, including strike action, whether such action be of his own staff or others, that affects or might affect his ability at any time to provide the Services or supply the Goods.

9.12  The Supplier will be responsible for providing and maintaining the Services to the Contract Standard and Supplying Goods during industrial action, at no additional cost

to the Authority. The Supplier must have in place contingency plans and arrangements which are approved by the Authority.

9.13  In the event of a major incident the Supplier shall perform the Services and Supply the Goods, together with such disaster recovery services as the Authority may require, in accordance with the relevant section of the Specification and the business continuity provisions of Clause 6 of Schedule 2 of the Call Off Terms and Conditions

10.  Change Control Process

10.1  Any changes to this Contract, including to the Services and Goods, shall only be agreed in accordance with the Change Control Process set out in Schedule 8.

11.  HealthTrust Europe Key Provisions

11.1  In the event that the Authority terminates its agreement with HealthTrust Europe (made pursuant to the provisions of the UHCW Framework) for convenience or otherwise, and such termination takes effect before the end of the Initial Term (as defined in the UHCW Framework) or in the event that the Authority’s agreement with HealthTrust Europe (made pursuant to the provisions of the UHCW Framework) expires without being renewed on or after such Initial Term, HealthTrust Europe shall notify the Supplier of such termination or expiry in accordance with the provisions of Clause 16 of Schedule 1 of the Framework Agreement (“Beneficiary Withdrawal Notice”). Upon receipt of such Beneficiary Withdrawal Notice by the Supplier, the Supplier shall cease to apply for the benefit of the Authority, the Contract Price or any special discounts in relation to such supply which applied solely by reason of the operation of the UHCW Framework and its associated services and/or framework agreements or any contract made between the Authority made pursuant thereto and further the Authority shall no longer be permitted to place Orders or benefit from the Contract Price, save with the prior written consent of HealthTrust Europe.

11.2  The Authority acknowledges and agrees that the Supplier is subject to an activity based income (ABI) management charge in relation to any Orders placed by the Authority under the Framework Agreement.

11.3   The Authority and the Supplier agree that (in addition to the Authority’s right to enforce the Contract) HealthTrust Europe may enforce any term of the Contract.

12.  Installation and Commissioning  Services    [  ] (only applicable to the Contract if this box is checked)

12.1  The Supplier shall provide the Installation and Commissioning Services in accordance with the terms set out in Schedule 5.

12.2  The Supplier shall provide all necessary Installation and Commissioning Services to the Authority (as set out within Schedule 5) within the Contract Price, at no additional cost to the Authority; such Installation and Commissioning Services shall be delivered within such timescales as may reasonably be required by the Authority and to the standards prescribed within Clause 1.2 of Schedule 5.

13.  Limitation of liability

13.1  Nothing in this Contract shall exclude or restrict the liability of either Party:
 
13.1.1   for death or personal injury resulting from its negligence;
 
13.1.2  for fraud or fraudulent misrepresentation; or
 
13.1.3  in any other circumstances where liability may not be limited or excluded under any applicable law.
 
13.2   Subject to Clauses 12.2, 13.1, 13.3 and 13.5 of this Schedule 2 of these Call-off Terms and Conditions, the total liability of each Party to the other under or in connection with this Contract whether arising in contract, tort, negligence, breach of statutory duty or otherwise shall be limited in aggregate to the greater of: (a) five million GBP (£5,000,000); or (b) one hundred and twenty five percent (125%) of the total Contract Price paid or payable by the Authority to the Supplier for the Goods and Services.
 
13.3  There shall be no right to claim losses, damages and/or other costs and expenses under or in connection with this Contract whether arising in contract (to include, without limitation, under any relevant indemnity), tort, negligence, breach of statutory duty or otherwise to the extent that any losses, damages and/or other costs and expenses claimed are in respect of loss of production, loss of business opportunity or are in respect of indirect loss of any nature suffered or alleged. For the avoidance of doubt, without limitation, the Parties agree that for the purposes of this Contract the following costs, expenses and/or loss of income shall be direct recoverable losses (to include under any relevant indemnity) provided such costs, expenses and/or loss of income are properly evidenced by the claiming Party:
 
13.3.1  extra costs incurred purchasing replacement or alternative Goods and Services;
 
13.3.2  costs incurred in relation to any product recall;
 
13.3.3  costs associated with advising, screening, testing, treating, retreating or otherwise providing healthcare to patients;
 
13.3.4  the costs of extra management time; and/or
 
13.3.5  loss of income due to an inability to provide health care services,
 
in each case to the extent to which such costs, expenses and/or loss of income arise or result from the other Party’s breach of contract, negligent act or omission, breach of statutory duty, and/or other liability under or in connection with this Contract.
 
13.4  Each Party shall at all times take all reasonable steps to minimise and mitigate any loss for which that Party is entitled to bring a claim against the other pursuant to this Contract.
 
13.5   If the total Contract Price paid or payable by the Authority to the Supplier over the Term:
 
11.5.1  is less than or equal to one million pounds (£1,000,000), then the figure of five million pounds (£5,000,000) at Clause 13.2 of this Schedule 2 of
these Call-off Terms and Conditions shall be replaced with one million pounds (£1,000,000);
 
13.5.2  is less than or equal to three million pounds (£3,000,000) but greater than one million pounds (£1,000,000), then the figure of five million pounds (£5,000,000) at Clause 13.2 of this Schedule 2 of these Call-off Terms and Conditions shall be replaced with three million pounds (£3,000,000);
 
13.5.3  is equal to, exceeds or will exceed ten million pounds (£10,000,000), but is less than fifty million pounds (£50,000,000), then the figure of five million pounds (£5,000,000) at Clause 13.2 of this Schedule 2 of these Call-off Terms and Conditions shall be replaced with ten million pounds (£10,000,000) and the figure of one hundred and twenty five percent (125%) at Clause 13.2 of this Schedule 2 of these Call-off Terms and Conditions shall be deemed to have been deleted and replaced with one hundred and fifteen percent (115%); and
 
13.5.4  is equal to, exceeds or will exceed fifty million pounds (£50,000,000), then the figure of five million pounds (£5,000,000) at Clause 13.2 of this Schedule 2 of these Call-off Terms and Conditions shall be replaced with fifty million pounds (£50,000,000) and the figure of one hundred and twenty five percent (125%) at Clause 13.2 of this Schedule 2 of these Call-off Terms and Conditions shall be deemed to have been deleted and replaced with one hundred and five percent (105%).
 
13.6  Clause 13 of this Schedule 2 of these Call-off Terms and Conditions shall survive the expiry of or earlier termination of this Contract for any reason.

14.   Insurance

14.1        Subject to Clauses 14.2 and 14.3 of this Schedule 2 of these Call-off Terms and Conditions and unless otherwise confirmed in writing by the Authority, as a minimum level of protection, the Supplier shall put in place and/or maintain in force at its own cost with a reputable commercial insurer, insurance arrangements in respect of employer’s liability, public liability, product liability and professional indemnity in accordance with Good Industry Practice with the minimum cover per claim of the greater of five million pounds (£5,000,000) or any sum as required by Law unless otherwise agreed with the Authority in writing. These requirements shall not apply to the extent that the Supplier is a member and maintains membership of each of the indemnity schemes run by the NHS Litigation Authority.

14.2        Without limitation to any insurance arrangements as required by Law, the Supplier shall put in place and/or maintain the different types and/or levels of indemnity arrangements specified in the Framework Agreement, if any.

14.3        Provided that the Supplier maintains all indemnity arrangements required by Law, the Supplier may self insure in order to meet other relevant requirements referred to at Clauses 14.1 and 14.2 of this Schedule 2 of these Call-off Terms and Conditions on condition that such self insurance arrangements offer the appropriate levels of protection and are approved by the Authority in writing prior to the Commencement Date.

14.4        The amount of any indemnity cover and/or self insurance arrangements shall not relieve the Supplier of any liabilities under this Contract. It shall be the responsibility of the Supplier to determine the amount of indemnity and/or self insurance cover that will be adequate to enable it to satisfy its potential liabilities under this Contract. Accordingly, the Supplier shall be liable to make good any deficiency if the proceeds of any indemnity cover and/or self insurance arrangement is insufficient to cover the settlement of any claim.

14.5        The Supplier warrants that it shall not take any action or fail to take any reasonable action or (in so far as it is reasonable and within its power) permit or allow others to take or fail to take any action, as a result of which its insurance cover may be rendered void, voidable, unenforceable, or be suspended or impaired in whole or in part, or which may otherwise render any sum paid out under such insurances repayable in whole or in part.

14.6        The Supplier shall from time to time and in any event within five (5) Business Days of written demand provide documentary evidence to the Authority that insurance arrangements taken out by the Supplier pursuant to Clause 14 of this Schedule 2 of these Call-off Terms and Conditions and/or the provisions of the Framework Agreement are fully maintained and that any premiums on them and/or contributions in respect of them (if any) are fully paid.

14.7        Upon the expiry or earlier termination of this Contract, the Supplier shall ensure that any ongoing liability it has or may have arising out of this Contract shall continue to be the subject of appropriate indemnity arrangements for the period of twenty one (21) years from termination or expiry of this Contract or until such earlier date as that liability may reasonably be considered to have ceased to exist.

15.  Term and termination

15.1  This Contract shall commence on the Commencement Date and, unless terminated earlier in accordance with the terms of this Contract or the general law, shall continue until the end of the Term.

15.2  The Authority:

15.2.1  subject to Clause 15.2.2 of this 0 of these Call-off Terms and Conditions shall be entitled to extend the Term on one or more occasions by giving the Supplier written notice no less than three (3) months prior to the date on which this Contract would otherwise have expired, provided that the duration of this Contract shall be no longer than the total term referred to in the Key Provisions; or

15.2.2   where the Term or any extension of the Term expires at a date the same as or after expiry of the Framework Agreement (including any extensions of the Framework Agreement in accordance with its terms), shall only be entitled to extend the Term with the prior written agreement of the Supplier, such agreement not to be unreasonably withheld or delayed.

15.3   In the case of a breach of any of the terms of this Contract by either Party that is capable of remedy (including, without limitation any breach of any KPI and, subject to Clause 9.7 of this Schedule 2 of these Call-off Terms and Conditions, any breach of any payment obligations under this Contract), the non-breaching Party may, without

prejudice to its other rights and remedies under this Contract, issue a Breach Notice and shall allow the Party in breach the opportunity to remedy such breach in the first instance via a remedial proposal put forward by the Party in breach (“Remedial Proposal”) before exercising any right to terminate this Contract in accordance with Clause 15.4(ii) of this Schedule 2 of these Call-off Terms and Conditions. Such Remedial Proposal must be agreed with the non-breaching Party (such agreement not to be unreasonably withheld or delayed) and must be implemented by the Party in breach in accordance with the timescales referred to in the agreed Remedial Proposal. Once agreed, any changes to a Remedial Proposal must be approved by the Parties in writing. Any failure by the Party in breach to:

15.3.1  put forward and agree a Remedial Proposal with the non -breaching Party in relation to the relevant default or breach within a period of ten (10) Business Days (or such other period as the non-breaching Party may agree in writing) from written notification of the relevant default or breach from the non-breaching Party;

15.3.2  comply with such Remedial Proposal (including, without limitation, as to its timescales for implementation, which shall be thirty (30) days unless otherwise agreed between the Parties); and/or

15.3.3   remedy the default or breach notwithstanding the implementation of such Remedial Proposal in accordance with the agreed timescales for implementation,

shall be deemed, for the purposes of Clause 15.4(ii) of this Schedule 2 of these Call- off Terms and Conditions, a material breach of this Contract by the Party in breach not remedied in accordance with an agreed Remedial Proposal.

15.4  Either Party may terminate this Contract by issuing a Termination Notice to the other Party if such other Party commits a material breach of any of the terms of this Contract which is:

(i)  not capable of remedy; or

(ii)  in the case of a breach capable of remedy, which is not remedied in accordance with a Remedial Proposal.

15.5  The Authority may terminate this Contract by issuing a Termination Notice to the Supplier if:

15.5.1  the Supplier does not commence supply of the Goods and/or delivery of the Services by any Long Stop Date;

15.5.2   the Supplier, or any third party guaranteeing the obligations of the Supplier under this Contract, ceases or threatens to cease carrying on its business; suspends making payments on any of its debts or announces an intention to do so; is, or is deemed for the purposes of any Law to be, unable to pay its debts as they fall due or insolvent; enters into or proposes any composition, assignment or arrangement with its creditors generally; takes any step or suffers any step to be taken in relation to its winding -up, dissolution, administration (whether out of court or otherwise) or reorganisation (by way of voluntary arrangement, scheme of arrangement or otherwise) otherwise than as part of, and exclusively for the purpose of, a bona fide reconstruction

or amalgamation; has a liquidator, trustee in bankruptcy, judicial custodian, compulsory manager, receiver, administrative receiver, administrator or similar officer appointed (in each case, whether out of court or otherwise) in respect of it or any of its assets; has any security over any of its assets enforced; or any analogous procedure or step is taken in any jurisdiction;

15.5.3  the Supplier undergoes a change of control within the meaning of sections 450 and 451 of the Corporation Tax Act 2010 (other than for an intra -group change of control) without the prior written consent of the Authority and the Authority shall be entitled to withhold such consent if, in the reasonable opinion of the Authority, the proposed change of control will have a material impact on the performance of this Contract or the reputation of the Authority;

15.5.4  the Supplier purports to assign, Sub-contract, novate, create a trust in or otherwise transfer or dispose of this Contract in breach of Clause 28.1 of this Schedule 2 of these Call-off Terms and Conditions;

15.5.5  pursuant to and in accordance with any termination rights set out in any Key Provisions and Clauses 15.6, 23.8; 25.2; 25.4 and 29.2 of this Schedule 2 of these Call-off Terms and Conditions; or

15.5.6   the warranty given by the Supplier pursuant to Clause 10.8 of this Schedule 2 of these Call-off Terms and Conditions is materially untrue, the Supplier commits a material breach of its obligation to notify the Authority of any Occasion of Tax Non-Compliance as required by Clause 10.8 of this Schedule 2 of these Call-off Terms and Conditions, or the Supplier fails to provide details of proposed mitigating factors as required by Clause 10.8 of this Schedule 2 of these Call-off Terms and Conditions that in the reasonable opinion of the Authority are acceptable.

15.6  If the Authority, acting reasonably, has good cause to believe that there has been a material deterioration in the financial circumstances of the Supplier and/or any third party guaranteeing the obligations of the Supplier under this Contract and/or any material Sub-contractor of the Supplier when compared to any information provided to and/or assessed by the Authority as part of any procurement process or other due diligence leading to the award of this Contract to the Supplier or the entering into a Sub-contract by the Supplier, the following process shall apply:

15.6.1  the Authority may (but shall not be obliged to) give notice to the Supplier requesting adequate financial or other security and/or assurances for due performance of its material obligations under this Contract on such reasonable and proportionate terms as the Authority may require within a reasonable time period as specified in such notice;

15.6.2  a failure or refusal by the Supplier to provide the financial or other security and/or assurances requested in accordance with Clause 15.6 of this Schedule 2 of these Call-off Terms and Conditions in accordance with any reasonable timescales specified in any such notice issued by the Authority shall be deemed a breach of this Contract by the Supplier and shall be referred to and resolved in accordance with the Dispute Resolution Procedure; and

15.6.3  a failure to resolve such breach in accordance with such Dispute Resolution Procedure by the end of the escalation stage of such process (as set out in Clause 22.3 of this Schedule 2 of these Call-off Terms and Conditions) shall entitle, but shall not compel, the Authority to terminate this Contract in accordance with Clause 15.4(i) of this Schedule 2 of these Call-off Terms and Conditions.

In order that the Authority may act reasonably in exercising its discretion in accordance with Clause 15.6 of this Schedule 2 of these Call-off Terms and Conditions, the Supplier shall provide the Authority with such reasonable and proportionate up-to-date financial or other information relating to the Supplier or any relevant third party entity upon request.

15.7  The Authority may terminate this Contract by issuing a Termination Notice to the Supplier where:

15.7.1  the Contract has been substantially amended to the extent that the Public Contracts Regulations 2015 require a new procurement procedure;

15.7.2  the Authority has become aware that the Supplier should have been excluded under Regulation 57(1) or (2) of the Public Contracts Regulations 2015 from the procurement procedure leading to the award of this Contract;

15.7.3  the Contract should not have been awarded to the Supplier in view of a serious infringement of obligations under European law declared by the Court of Justice of the European Union under Article 258 of the Treaty on the Functioning of the EU; or

15.7.4  there has been a failure by the Supplier and/or one its Sub-contractors to comply with legal obligations in the fields of environmental, social or labour Law. Where the failure to comply with legal obligations in the fields of environmental, social or labour Law is a failure by one of the Supplier’s Sub-contractors, the Authority may request the replacement of such Sub-contractor and the Supplier shall comply with such request as an alternative to the Authority terminating this Contract under this Clause 15.7.4.

 

15.8  If the Authority novates this Contract to any body that is not a Contracting Authority, from the effective date of such novation, the rights of the Authority to terminate this Contract in accordance with Clause 15.5.2 to Clause 15.5.4 of this Schedule 2 of these Call-off Terms and Conditions shall be deemed mutual termination rights and the Supplier may terminate this Contract by issuing a Termination Notice to the entity assuming the position of the Authority if any of the circumstances referred to in such Clauses apply to the entity assuming the position of the Authority.

15.9  Within three (3) months of the Commencement Date the Supplier shall develop and agree an exit plan with the Authority consistent with the Exit Requirements, which shall ensure continuity of the Services on expiry or earlier termination of this Contract. The Supplier shall provide the Authority with the first draft of an exit plan within one (1) month of the Commencement Date.  The Parties shall review and, as appropriate, update the exit plan on each anniversary of the Commencement Date of this Contract.         If the Parties cannot agree an exit plan in accordance with the timescales set out in this Clause 15.9 of this Schedule 2 of these Call-off Terms and Conditions (such agreement not to be unreasonably withheld or delayed), such failure to agree shall be deemed a Dispute, which shall be referred to and resolved in accordance with the Dispute Resolution Procedure.  

16.  Consequences of Expiry or Early Termination of this Contract

16.1  Subject to the provision set out in Clause 16.5 of this Schedule 2 of these Call-off Terms and Conditions, upon expiry or earlier termination of this Contract, the Authority agrees to pay the Supplier for:

16.1.1  the Goods which have been supplied by the Supplier and not rejected by the Authority in accordance with this Contract prior to the expiry or earlier termination of this Contract;  and

16.1.2  the Services which have been completed by the Supplier in accordance with this Contract prior to expiry or earlier termination of this Contract.

16.2  Immediately following expiry or earlier termination of this Contract and/or in accordance with any timescales as set out in the agreed exit plan: 

16.2.1  the Supplier shall comply with its obligations under any agreed exit plan; 

16.2.2  all data, excluding Personal Data, documents and records (whether stored electronically or otherwise) relating in whole or in part to the Services, including without limitation relating to patients or other service users, and all other items provided on loan or otherwise to the Supplier by the Authority shall be delivered by the Supplier to the Authority provided that the Supplier shall be entitled to keep copies to the extent that: (a) the content does not relate solely to this Contract; (b) the Supplier is required by Law and/or Guidance to keep copies; or (c) the Supplier was in possession of such data, documents and records prior to the Commencement Date; and

16.2.3  any Personal Data Processed by the Supplier on behalf of the Authority shall be returned to the Authority or destroyed in accordance with the relevant provisions of the Data Protection Protocol.  

16.3  The Supplier shall retain all data relating to the provision of the Services that are not transferred or destroyed pursuant to Clause 16.2 of this Schedule 2 of these Call-off Terms and Conditions for the period set out in Clause 24.1 of this Schedule 2 of these Call-off Terms and Conditions.

16.4  The Supplier shall cooperate fully with the Authority or, as the case may be, any replacement supplier during any re-procurement and handover period prior to and following the expiry or earlier termination of this Contract.  This cooperation shall extend to providing access to all information relevant to the operation of this Contract, as reasonably required by the Authority to achieve a fair and transparent re-procurement and/or an effective transition without disruption to routine operational requirements.

16.5  If the Authority terminates the Contract in accordance with Clause 15.5.1 of this Schedule 2 of these Call-off Terms and Conditions, the Authority shall be entitled to a refund of any sums paid under this Contract provided the Authority informs the Supplier in writing of its intention to claim such refund no later than thirty (30) days of the effective date of such termination. Should the Authority seek a refund in respect of Goods already delivered, the Authority shall return such Goods to the Supplier at the Supplier’s written request and at the Supplier’s cost and expense.

16.6  Immediately upon expiry or earlier termination of this Contract any licence or lease entered into in accordance with any Order Form shall automatically terminate.

16.7  The expiry or earlier termination of this Contract for whatever reason shall not affect any rights or obligations of either Party which accrued prior to such expiry or earlier termination.

16.8  The expiry or earlier termination of this Contract shall not affect any obligations which expressly or by implication are intended to come into or continue in force on or after such expiry or earlier termination. 

16.9   The expiry or earlier termination of the Framework Agreement shall not affect this Contract. For the avoidance of doubt, any obligations set out in the Framework Agreement that form part of this Contract shall continue to apply for the purposes of this Contract notwithstanding any termination of the Framework Agreement. 

17.  Staff Information and the Application of TUPE at the end of the Contract

17.1  Upon the day which is no greater than nine (9) months before the expiry of this Contract or as soon as the Supplier is aware of the proposed termination of the Contract, the Supplier shall, within twenty eight (28) days of receiving a written request from the Authority and to the extent permitted by Law, supply to the Authority and keep updated all information required by the Authority as to the terms and conditions of employment and employment history of any Supplier Personnel (including all employee liability information identified in regulation 11 of TUPE) and the Supplier shall warrant such information is full, complete and accurate.

17.2  No later than twenty eight (28) days prior to the Subsequent Transfer Date, the Supplier shall or shall procure that any Sub-contractor shall provide a final list to the Successor and/or the Authority, as appropriate, containing the names of all the Subsequent Transferring Employees whom the Supplier or Sub-contractor expects will transfer to the Successor or the Authority and all employee liability information identified in regulation 11 of TUPE in relation to the Subsequent Transferring Employees.

17.3  If the Supplier shall, in the reasonable opinion of the Authority, deliberately not comply with its obligations under Clauses 17.1 and 17.2 of this Schedule 2 of these Call-off Terms and Conditions, the Authority may withhold payment under Clause 9 of this Schedule 2 of these Call-off Terms and Conditions.

17.4  The Supplier shall be liable to the Authority for, and shall indemnify and keep the Authority indemnified against, any loss, damages, costs, expenses (including without limitation legal costs and expenses), claims or proceedings that arise or result from any deficiency or inaccuracy in the information which the Supplier is required to provide under Clauses 17.1 and 17.2 of this Schedule 2 of these Call-off Terms and Conditions.

17.5  Subject to Clauses 17.6 and 17.7 of this Schedule 2 of these Call-off Terms and Conditions, during the period of nine (9) months preceding the expiry of this Contract or after notice of termination of this Contract has been served by either Party, the Supplier shall not, and shall procure that any Sub-contractor shall not, without the prior written consent of the Authority, such consent not to be unreasonably withheld or delayed:

17.5.1  make, propose or permit any material changes to the terms and conditions of employment or other arrangements of any of the Supplier Personnel;

17.5.2  increase or seek to increase the emoluments (excluding cost of living increases awarded in the ordinary course of business) payable to any of the Supplier Personnel;

17.5.3  replace any of the Supplier Personnel or increase the total number of employees providing the Services;

17.5.4  deploy any person other than the Supplier Personnel to perform the Services;

17.5.5  terminate or give notice to terminate the employment or arrangements of any of the Supplier Personnel;

17.5.6  increase the proportion of working time spent on the Services by any of the Supplier Personnel; or

17.5.7  introduce any new contractual term or customary practice concerning the making of any lump sum payment on the termination of employment of any of the Supplier Personnel.

17.6  Clause 17.5 of this Schedule 2 of these Call-off Terms and Conditions shall not prevent the Supplier or any Sub-contractor from taking any of the steps prohibited in that Clause in circumstances where the Supplier or Sub-contractor is required to take such a step pursuant to any changes in legislation or pursuant to a collective agreement in force at that time.

17.7     Where the obligations on the Supplier under Clause 17 of this Schedule 2 of these Call-off Terms and Conditions are subject to the Data Protection Legislation, the Supplier will, and shall procure that any Sub-contractor will, use its best endeavours to seek the consent of the Supplier Personnel to disclose any information covered under the Data Protection Legislation and utilise any other exemption or provision within the Data Protection Legislation which would allow such disclosure.

17.8     Having as appropriate gained permission from any Sub-contractor, the Supplier hereby permits the Authority to disclose information about the Supplier Personnel to any Interested Party provided that the Authority informs the Interested Party in writing of the confidential nature of the information.

17.9     The Parties agree that where a Successor or the Authority provides the Services or services which are fundamentally the same as the Services in the immediate or subsequent succession to the Supplier or Sub-contractor (in whole or in part) on expiry or early termination of this Contract (howsoever arising) TUPE, the Cabinet Office Statement and Fair Deal for Staff Pensions may apply in respect of the subsequent provision of the Services or services which are fundamentally the same  as the Services.  If TUPE, the Cabinet Office Statement and Fair Deal for Staff Pensions apply then Clause 17.11 to Clause 17.14 of this Schedule 2 of these Call-off Terms and Conditions and (where relevant) the requirements of Clause 1.5 of Part D of Schedule 7 of the NHS Terms and Conditions for the Provision of Services (Contract Version) (December 2016) shall apply.

17.10   If on the termination or at the end of the Contract TUPE does not apply, then all Employment Liabilities and any other liabilities in relation to the Supplier Personnel shall remain with the Supplier or Sub-contractor as appropriate.  The Supplier will, and shall procure that any Sub-contractor shall, indemnify and keep indemnified the Authority in relation to any Employment Liabilities arising out of or in connection with any allegation or claim raised by any Supplier Personnel.

17.11   In accordance with TUPE, and any other policy or arrangement applicable, the Supplier shall, and will procure that any Sub-contractor shall, comply with its obligations to inform and consult with the appropriate representatives of any of its employees affected by the subsequent transfer of the Services or services which are fundamentally the same as the Services.

17.12   The Supplier will and shall procure that any Sub-contractor will on or before any Subsequent Transfer Date:

17.12.1  pay all wages, salaries and other benefits of the Subsequent Transferring Employees and discharge all other financial obligations (including reimbursement of any expenses and any contributions to retirement benefit schemes) in respect of the period between the Transfer Date and the Subsequent Transfer Date;

17.12.2  account to the proper authority for all PAYE, tax deductions and national insurance contributions payable in respect of the Subsequent Transferring Employees in the period between the Transfer Date and the Subsequent Transfer Date;

17.12.3  pay any Successor or the Authority, as appropriate, the amount which would be payable to each of the Subsequent Transferring Employees in lieu of accrued but untaken holiday entitlement as at the Subsequent Transfer Date;

17.12.4  pay any Successor or the Authority, as appropriate, the amount which fairly reflects the progress of each of the Subsequent Transferring Employees towards achieving any commission, bonus, profit share or other incentive payment payable after the Subsequent Transfer Date wholly or partly in respect of a period prior to the Subsequent Transfer Date; and

17.12.5   subject to any legal requirement, provide to the Successor or the Authority, as appropriate, all personnel records relating to the Subsequent Transferring Employees including, without prejudice to the generality of the foregoing, all records relating to national insurance, PAYE and income tax. The Supplier shall for itself and any Sub-contractor warrant that such records are accurate and up to date.

17.13   The Supplier will and shall procure that any Sub-contractor will indemnify and keep indemnified the Authority and/or a Successor in relation to any Employment Liabilities arising out of or in connection with any claim arising from:

17.13.1  the Supplier’s or Sub-contractor’s failure to perform and discharge its obligations under Clause 17.2 of this Schedule 2 of these Call-off Terms and Conditions;

17.13.2  any act or omission by the Supplier or Sub-contractor in respect of the Subsequent Transferring Employees occurring on or before the Subsequent Transfer Date;

17.13.3  any allegation or claim by any person who is not a Subsequent Transferring Employee but who alleges that their employment should transfer or has transferred to the Successor or the Authority, as appropriate;

17.13.4  any emoluments payable to a person employed or engaged by the Supplier or Sub-contractor (including without limitation all wages, accrued holiday pay, bonuses, commissions, PAYE, national insurance contributions, pension contributions and other contributions) payable in respect of any period on or before the Subsequent Transfer Date;

17.13.5   any allegation or claim by any of the Subsequent Transferring Employees on the grounds that the Successor or Authority, as appropriate, has failed to continue a benefit provided by the Supplier or Sub-contractor as a term of such Subsequent Transferring Employee’s contract as at the Subsequent Transfer Date where it was not reasonably practicable for the Successor or Authority, as appropriate, to provide an identical benefit but where the Successor or Authority, as appropriate, has provided (or offered to provide where such benefit is not accepted by the Subsequent Transferring Employee) an alternative benefit which, taken as a whole, is no less favourable to such Subsequent Transferring Employee; and

17.13.6  any act or omission of the Supplier or any Sub-contractor in relation to its obligations under regulation 13 of TUPE, or in respect of an award of compensation under regulation 15 of TUPE except to the extent that the liability arises from the Successor’s or Authority’s failure to comply with regulation 13(4) of TUPE.

17.14   The Supplier will, or shall procure that any Sub-contractor will, on request by the Authority provide a written and legally binding indemnity in the same terms as set out in Clause 17.13 of this Schedule 2 of these Call-off Terms and Conditions to any Successor in relation to any Employment Liabilities arising up to and including the Subsequent Transfer Date.

17.15   The Supplier will indemnify and keep indemnified the Authority and/or any Successor in respect of any Employment Liabilities arising from any act or omission of the Supplier or Sub-contractor in relation to any other Supplier Personnel who is not a Subsequent Transferring Employee arising during any period whether before, on or after the Subsequent Transfer Date.

17.16   If any person who is not a Subsequent Transferring Employee claims or it is determined that their contract of employment has been transferred from the Supplier or any Sub-contractor to the Authority or Successor pursuant to TUPE or claims that their employment would have so transferred had they not resigned, then:

17.16.1  the Authority will, or shall procure that the Successor will, within seven (7) days of becoming aware of that fact, give notice in writing to the Supplier;

17.16.2  the Supplier may offer (or may procure that a Sub-contractor may offer) employment to such person within twenty eight (28) days of the notification by the Authority or Successor;

17.16.3   if such offer of employment is accepted, the Authority will, or shall procure that the Successor will, immediately release the person from their employment; and

17.16.4  if after the period in Clause 17.16.2 of this Schedule 2 of these Call-off Terms and Conditions has elapsed, no such offer of employment has been made or such offer has been made but not accepted, the Authority will, or shall procure that the Successor will (whichever is the provider of the Services or services of the same or similar nature to the Services), employ that person in accordance with its obligations and duties under TUPE and shall be responsible for all liabilities arising in respect of any such person after the Subsequent Transfer Date.

18.  Packaging, Identification, End of Use and Coding Requirements

18.1  The Supplier shall comply with all obligations imposed on it by Law relevant to the Goods in relation to packaging, identification, and obligations following end of use by the Authority.

18.2  Unless otherwise specified in the Specification and Tender Response Document or otherwise agreed with the Authority in writing, the Goods shall be securely packed in trade packages of a type normally used by the Supplier for deliveries of the same or similar goods in the same quantities within the United Kingdom.

18.3   The Supplier shall comply with any labelling requirements in respect of the Goods: (a) specified in the Specification and Tender Response Document; (b) agreed with the Authority in writing; and/or (c) required to comply with Law or Guidance.

18.4   The Supplier shall ensure that all Goods that are required by Law or Guidance to bear any safety information, environmental information, any mark, tab, brand, label, serial numbers or other device indicating place of origin, inspection by any government or other body or standard of quality at the point such Goods are delivered shall comply with such requirements at the point of delivery. 

18.5  Unless otherwise set out in the Specification and Tender Response Document or agreed with the Authority in writing, the Supplier shall collect without charge any returnable containers and/or packages (including pallets) within twenty-one (21) days of the date of the relevant delivery. Empty containers and/or packages not so removed may be returned by the Authority at the Supplier’s expense or otherwise disposed of at the Authority’s discretion.  The Supplier shall credit the Authority in full for any containers for which the Authority has been charged upon their collection, return and/or disposal by the Authority in accordance with Clause 18.5 of this Schedule 2 of these Call-off Terms and Conditions. 

18.6  Unless otherwise confirmed and/or agreed by the Authority in writing and subject to Clause 18.7 of this Schedule 2 of these Call-off Terms and Conditions, the Supplier shall ensure full compliance with any Guidance issued by the Department of Health in relation to the adoption of GS1 and PEPPOL standards (to include, without limitation, any supplier compliance timeline and other policy requirements published by the Department of Health in relation to the adoption of GS1 and PEPPOL standards for master data provision and exchange, barcode labelling, and purchase-to-pay transacting).

18.7  Once compliance with any published timelines has been achieved by the Supplier pursuant to Clause 18.6 of this Schedule 2 of these Call-off Terms and Conditions, the Supplier shall, during the Term, maintain the required level of compliance relating to the Goods in accordance with any such requirements and Guidance referred to as part of this Contract.

18.8  Once product information relating to Goods is placed by the Supplier into a GS1 certified data pool, the Supplier shall, during the Term, keep such information updated with any changes to the product data relating to the Goods.

19.  Sustainable Development

19.1  The Supplier shall comply in all material respects with applicable environmental, social and labour Law requirements in force from time to time in relation to the Goods and Services. Where the provisions of any such Law are implemented by the use of voluntary agreements, the Supplier shall comply with such agreements as if they were incorporated into English law subject to those voluntary agreements being cited in the Specification and Tender Response Document. Without prejudice to the generality of the foregoing, the Supplier shall:

19.1.1  comply with all Policies and/or procedures and requirements set out in the Specification and Tender Response Document in relation to any stated environmental, social and labour requirements, characteristics and impacts of the Goods and Services and the Supplier’s supply chain;

19.1.2  maintain relevant policy statements documenting the Supplier’s significant labour, social and environmental aspects as relevant to the Goods and Services being supplied and provided and as proportionate to the nature and scale of the Supplier’s business operations; and

19.1.3  maintain plans and procedures that support the commitments made as part of the Supplier’s significant labour, social and environmental policies, as referred to at Clause 19.1.2 of this Schedule 2 of these Call-off Terms and Conditions.

19.2  The Supplier shall meet reasonable requests by the Authority for information evidencing the Supplier’s compliance with the provisions of Clause 19 of this Schedule 2 of these Call-off Terms and Conditions.

20.  Electronic Product and Services Information

20.1     Where requested by the Authority, the Supplier shall provide the Authority the Product Information and the Services Information in such manner and upon such media as agreed between the Supplier and the Authority from time to time for the sole use by the Authority.

20.2     The Supplier warrants that the Product Information and the Services Information is complete and accurate as at the date upon which it is delivered to the Authority and that the Product Information and the Services Information shall not contain any data or statement which gives rise to any liability on the part of the Authority following publication of the same in accordance with Clause 20 of this Schedule 2 of these Call-off Terms and Conditions.

20.3     If the Product Information and/or the Services Information ceases to be complete and accurate, the Supplier shall promptly notify the Authority in writing of any modification or addition to or any inaccuracy or omission in the Product Information and/or the Services Information.

20.4     The Supplier grants the Authority a perpetual, non-exclusive, royalty free licence to use and exploit the Product Information and the Services Information and any Intellectual Property Rights in the Product Information and the Services Information for the purpose of illustrating the range of goods and services (including, without limitation, the Goods and Services) available pursuant to the Authority’s contracts from time to time. Subject to Clause 20.5 of this Schedule 2 of these Call-off Terms and Conditions, no obligation to illustrate or advertise the Product Information or the Services Information is imposed on the Authority, as a consequence of the licence conferred by this Clause 20.4 of this Schedule 2 of these Call-off Terms and Conditions.

20.5     The Authority may reproduce for its sole use the Product Information and the Services Information provided by the Supplier in the Authority’s product and/or services catalogues from time to time which may be made available on any NHS communications networks in electronic format and/or made available on the Authority’s external website and/or made available on other digital media from time to time.

20.6     Before any publication of the Product Information and the Services Information (electronic or otherwise) is made by the Authority, the Authority will submit a copy of the relevant sections of the Authority’s product and/or services catalogues to the Supplier for approval, such approval not to be unreasonably withheld or delayed. For the avoidance of doubt the Supplier shall have no right to compel the Authority to exhibit the Product Information and/or the Services Information in any product and/or services catalogues as a result of the approval given by it pursuant to this Clause 20.6 of this Schedule 2 of these Call-off Terms and Conditions or otherwise under the terms of this Contract.

20.7     If requested in writing by the Authority, and to the extent not already agreed as part of the Specification and Tender Response Document, the Supplier and the Authority shall discuss and seek to agree in good faith arrangements to use any Electronic Trading System.

21.  Change Management

21.1     The Supplier acknowledges to the Authority that the Authority’s requirements for the Goods and/or Services may change during the Term and the Supplier shall not unreasonably withhold or delay its consent to any reasonable variation or addition to the Specification and Tender Response Document, as may be requested by the Authority from time to time.

21.2     Subject to Clause 21.3 of this Schedule 2 of these Call-off Terms and Conditions, any change to the Goods and/or Services or other variation to this Contract shall only be binding once it has been agreed (a) in accordance with any Change Control Process if any Key Provisions specify that changes are subject to a formal change control process; or (b) if the Key Provisions make no such reference, in writing and signed by an authorised representative of both Parties.

21.3     Any change to the Data Protection Protocol shall be made in accordance with the relevant provisions of that protocol. 

22.  Dispute Resolution

22.1  During any Dispute, including a Dispute as to the validity of this Contract, it is agreed that the Supplier shall continue its performance of the provisions of the Contract (unless the Authority requests in writing that the Supplier does not do so).

22.2  In the case of a Dispute arising out of or in connection with this Contract the Supplier and the Authority shall make every reasonable effort to communicate and cooperate with each other with a view to resolving the Dispute and follow the procedure set out in Clause 22.3 of this Schedule 2 of these Call-off Terms and Conditions as the first stage in the Dispute Resolution Procedure.

22.3  If any Dispute arises out of the Contract either Party may serve a notice on the other Party to commence formal resolution of the Dispute. The Parties shall first seek to resolve the Dispute by escalation in accordance with the management levels as set out in Clause 5 of the Key Provisions. Respective representatives at each level, as set out in Clause 5 of the Key Provisions, shall have five (5) Business Days at each level during which they will use their reasonable endeavours to resolve the Dispute before escalating the matter to the next level until all levels have been exhausted. Level 1 will commence on the date of service of the Dispute Notice. The final level of the escalation process shall be deemed exhausted on the expiry of five (5) Business Days following escalation to that level unless otherwise agreed by the Parties in writing.

22.4  If the procedure set out in Clause 22.3 of this Schedule 2 of these Call-off Terms and Conditions above has been exhausted and fails to resolve such Dispute, as part of the Dispute Resolution Procedure, the Parties will attempt to settle it by mediation. The Parties shall, acting reasonably, attempt to agree upon a mediator. In the event that the Parties fail to agree a mediator within five (5) Business Days following the exhaustion of all levels of the escalation procedure at Clause 22.3 of this Schedule 2 of these Call-off Terms and Conditions, the mediator shall be nominated and confirmed by the Centre for Effective Dispute Resolution, London.

22.5  The mediation shall commence within twenty eight (28) days of the confirmation of the mediator in accordance with Clause 22.4 of this Schedule 2 of these Call-off Terms and Conditions or at such other time as may be agreed by the Parties in writing.  Neither Party will terminate such mediation process until each Party has made its opening presentation and the mediator has met each Party separately for at least one hour or one Party has failed to participate in the mediation process. After this time, either Party may terminate the mediation process by notification to the other party (such notification may be verbal provided that it is followed up by written confirmation). The Authority and the Supplier will cooperate with any person appointed as mediator providing them with such information and other assistance as they shall require and will pay their costs, as they shall determine, or in the absence of such determination such costs will be shared equally.

22.6  Nothing in this Contract shall prevent:

22.6.1  the Authority taking action in any court in relation to any death or personal injury arising or allegedly arising in connection with the supply of the Goods and/or the provision of the Services; or

22.6.2  either Party seeking from any court any interim or provisional relief that may be necessary to protect the rights or property of that Party or that relates to the safety of patients and other service users or the security of Confidential Information, pending resolution of the relevant Dispute in accordance with the Dispute Resolution Procedure.

22.7  Clause 22 of this Schedule 2 of these Call-off Terms and Conditions shall survive the expiry of or earlier termination of this Contract for any reason.

23.  Force Majeure

23.1  Subject to Clause 23.2 of this Schedule 2 of these Call-off Terms and Conditions neither Party shall be liable to the other for any failure to perform all or any of its obligations under this Contract nor liable to the other Party for any loss or damage arising out of the failure to perform its obligations to the extent only that such performance is rendered impossible by a Force Majeure Event.

23.2  The Supplier shall only be entitled to rely on a Force Majeure Event and the relief set out in Clause 23 of this Schedule 2 of these Call-off Terms and Conditions and will not be considered to be in default or liable for breach of any obligations under this Contract if:

23.2.1  the Supplier has fulfilled its obligations pursuant to Clause 6 of this Schedule 2 of these Call-off Terms and Conditions;

23.2.2  the Force Majeure Event does not arise directly or indirectly as a result of any wilful or negligent act or default of the Supplier; and

23.2.3  the Supplier has complied with the procedural requirements set out in Clause 23 of this Schedule 2 of these Call-off Terms and Conditions.

23.3  Where a Party is (or claims to be) affected by a Force Majeure Event it shall use reasonable endeavours to mitigate the consequences of such a Force Majeure Event upon the performance of its obligations under this Contract, and to resume the performance of its obligations affected by the Force Majeure Event as soon as practicable.

23.4  Where the Force Majeure Event affects the Supplier’s ability to perform part of its obligations under the Contract the Supplier shall fulfil all such contractual obligations that are not so affected and shall not be relieved from its liability to do so.

23.5  If either Party is prevented or delayed in the performance of its obligations under this Contract by a Force Majeure Event, that Party shall as soon as reasonably practicable serve notice in writing on the other Party specifying the nature and extent of the circumstances giving rise to its failure to perform or any anticipated delay in performance of its obligations.

23.6  Subject to service of such notice, the Party affected by such circumstances shall have no liability for its failure to perform or for any delay in performance of its obligations affected by the Force Majeure Event only for so long as such circumstances continue and for such time after they cease as is necessary for that Party, using its best endeavours, to recommence its affected operations in order for it to perform its obligations.

23.7   The Party claiming relief shall notify the other in writing as soon as the consequences of the Force Majeure Event have ceased and of when performance of its affected obligations can be resumed.

23.8  If the Supplier is prevented from performance of its obligations as a result of a Force Majeure Event, the Authority may at any time, if the Force Majeure Event subsists for thirty (30) days or more, terminate this Contract by issuing a Termination Notice to the Supplier.

23.9  Following such termination in accordance with Clause 23.8 of this Schedule 2 of these Call-off Terms and Conditions and subject to Clause 23.10 of this Schedule 2 of these Call-off Terms and Conditions, neither Party shall have any liability to the other.

23.10  Any rights and liabilities of either Party which have accrued prior to such termination in accordance with Clause 23.8 of this Schedule 2 of these Call-off Terms and Conditions shall continue in full force and effect unless otherwise specified in this Contract.

24.